Loading…
2024 WCW Annual Conference & Exhibition
Wednesday September 18, 2024 1:30pm - 2:00pm CDT
City of Winnipeg's South End Water Pollution Control Centre (SEWPCC) has undergone a major expansion and upgrade, allowing the plant to meet more stringent discharge limits and to increase its peak secondary treatment capacity from 100 ML/d to 225 ML/d. The previous High Purity Oxygen (HPO) tanks were replaced by three integrated fixed film activated sludge (IFAS) bioreactors set up in a preanoxic, anaerobic, anoxic, aerobic, and post aerobic configuration. The HPO tanks were converted to two primary sludge fermentation units to provide the substrates required to enhance biological phosphorous removal performance. In the absence of the fermenters, operation logic of the bioreactors was modified to promote biological phosphorus removal and lower the ferric chloride consumption that was dosed to the bioreactors' mixed liquor to chemically precipitate phosphorous. The BNR process at SEWPCC has resulted in considerable improvement in the effluent quality with TSS
Speakers
avatar for Mahdi Bazri

Mahdi Bazri

Process Engineer and Project Manager, Jacobs
Mahdi is a process engineer and technical lead with Jacobs. Mahdi’s experience spans from developing conceptual designs to procurement, construction, commissioning, and handover of multiple water and wastewater treatment plants as well as landfill gas management systems.Mahdi has... Read More →
Wednesday September 18, 2024 1:30pm - 2:00pm CDT
Meeting Room 2 WCC Main Floor

Sign up or log in to save this to your schedule, view media, leave feedback and see who's attending!

Share Modal

Share this link via

Or copy link